The usual way
From Phase 1 by the Sector 43 connector and Golf Course Road to DLF Phase 3.
Within Gurgaon · Rates updated September 2026
Sushant Lok Phase 1 and DLF Phase 3 are neighbouring parts of Gurgaon, so the drive is short. The work is at both ends: staircase-only buildings and narrow lanes in Phase 1, and mixed floors and apartments in DLF Phase 3. Most moves finish the same day.
Packers and movers from Sushant Lok Phase 1 to DLF Phase 3 charge ₹6,500–₹10,500 for a 1 BHK, ₹9,500–₹15,500 for a 2 BHK with stairs at both ends and ₹14,000–₹23,000 for a 3 BHK in 2026, including packing, staircase handling, transport, unloading and reassembly. A 7 AM start usually finishes by 3 to 5 PM.
| Home size | Total | Packing and loading | Transport and delivery |
|---|---|---|---|
| 1 BHKFlat or studio | ₹6,500 – ₹10,500 | ₹3,500 – ₹5,500 | ₹3,000 – ₹5,000 |
| 2 BHKStairs at both ends. With a lift in DLF Phase 3: ₹9,000 – ₹14,500 | ₹9,500 – ₹15,500 | ₹6,000 – ₹10,000 | ₹3,500 – ₹5,500 |
| 3 BHKFull family move | ₹14,000 – ₹23,000 | ₹9,000 – ₹15,000 | ₹5,000 – ₹8,000 |
| 4 BHK+Large independent floor | ₹19,000 – ₹30,000 | ₹13,000 – ₹20,000 | ₹6,000 – ₹10,000 |
On so short a move most of the price is packing and staircase handling, not transport. The survey takes about 20 minutes and the price it gives is the final bill.
Pick your home size and tell us about stairs and heavy items at both ends. The range moves the way a survey would move it.
Estimated total, Sushant Lok Phase 1 to DLF Phase 3
₹9,500 – ₹15,500
2 BHK base rate. No access or packing add-ons.
Fix this price with a free surveyAn estimate, not a quote. The survey fixes your price in writing.
Survey of both homes for stairs, lifts and the vehicle each lane will take.
Loading starts before the water tankers occupy several Phase 1 lanes from 7:30 to 9:30 AM.
Packing and loading take 3 to 5 hours depending on home size; the truck leaves before the Galleria traffic builds.
25 to 40 minutes to DLF Phase 3, avoiding the MG Road peak from 8:30 to 10:30 AM.
Unloading and reassembly take 2 to 4 hours. A 4 BHK should start at 6 AM.
From Phase 1 by the Sector 43 connector and Golf Course Road to DLF Phase 3.
MG Road and Sikanderpur instead. The driver decides on the morning.
The Galleria Market side is congested from about 11 AM, Thursday to Sunday, which is why loading starts early.
Pieces too large for the stairs are dismantled in Phase 1, wrapped individually with their hardware bagged, and reassembled in the room in DLF Phase 3.
Internal lanes are about 14 to 18 feet wide, so loading is by mini tempo, not a full-size container truck.
Most Phase 1 buildings are staircase-only, so furniture and appliances come down the stairs.
Some apartment buildings with lifts, some builder floors with stairs only, confirmed at the survey. A lift can take reassembled panels where its size allows.
Most internal roads take a full-size truck; deeper plot rows need a mini tempo. Builder floors have on-road parking only, arranged with neighbours or the RWA where possible.
A 1 BHK costs ₹6,500–₹10,500, a 2 BHK ₹9,500–₹15,500 with stairs at both ends (₹9,000–₹14,500 with a lift in DLF Phase 3), a 3 BHK ₹14,000–₹23,000 and a 4 BHK ₹19,000–₹30,000.
Usually. A 7 AM start, 3 to 5 hours of packing and loading, 25 to 40 minutes on the road and 2 to 4 hours of unloading finishes by 3 to 5 PM. A 4 BHK should start at 6 AM.
No. The stairs at both ends are assessed at the survey and included in the confirmed price; nothing is added on the day.
Yes. A bike costs about ₹1,500–₹3,000 and car transport starts at ₹3,500, though on so short a route most people drive their own vehicle.
Call +91 93304 00200 or send the form. You get a written price after the survey, and it does not change on move day.